Straight answers

The concerns are reasonable. The scale is the surprise.

Water, jobs, housing, abatements, and the electric bill are the questions residents actually ask. These answers use the figures published by Building Bastrop County and Tomorrow Begins Here.

The short version of the loudest claims — water, noise, heat, the grid — is on themyth busters page.

Will a data center drain Bastrop’s water?

The campuses planned here are designed around closed-loop cooling. The same water stays in a sealed system. It is not an evaporative tower that has to be refilled all day. Building Bastrop County puts Pacifico’s potable use at about 2,000 gallons a day — 23 living-unit equivalents — against roughly 3,000 equivalents for a residential use of that scale. Tomorrow Begins Here compares a modern closed-loop campus, about 5 million gallons a year, with an 18-hole golf course at about 114 million gallons a year, and with a 1,000-home subdivision at 300,000 to 400,000 gallons a day. All U.S. data centers together accounted for less than 0.5% of national freshwater use in 2023.

If they only hire a small permanent staff, why do they matter?

The value is the taxable asset, not a headcount that fills schools. A billion-dollar building that adds almost no students, little daily traffic, and its own security and fire systems still pays for teachers, classrooms, and emergency equipment. Each construction phase is also published at 400 to 600 jobs, and the permanent technical roles pay roughly $55,000 to $130,000 and up. Many of those paths run through a trade, a certificate, or military technical training, not a four-year degree.

Will this do to housing what Austin’s boom did?

A permanent crew measured in dozens does not create a new city of commuters. A 1,000-home subdivision, the kind of alternative use discussed for land like this, adds about 1,500 students, a morning rush, and a heavy draw on water and emergency calls. The data center adds the tax base and skips that household demand. Building Bastrop County reports that comparable rural markets have not seen housing spikes attributable to the data center itself.

Isn’t a tax abatement just a giveaway?

An abatement is a temporary discount to win a project that is choosing among hundreds of sites. On the EdgeConneX land, the starting point was about $25,000 a year. Building Bastrop County reports that during the abatement the county and Bastrop ISD still receive more than $107 million. When the abatement ends, the full commercial value is what gets taxed. Pacifico took the other route: it withdrew its Chapter 312 and JETI applications and is published as paying full property taxes, more than $20 million a year.

Will my electric bill go up?

Pacifico’s plan is 710 megawatts of generation on the campus itself. Building Bastrop County describes that as no draw on the ERCOT grid and no rate impact from that design. For grid-connected load, Tomorrow Begins Here points to Texas SB 6: large facilities can curtail sharply during grid stress so houses and hospitals keep power, and large industrial customers are expected to pay for the substations and lines they require.

How does any of this help my property tax?

A county that lives on houses asks those houses to fund every new classroom and ambulance. A commercial asset of this size pays a large share of the same bills without adding a family to the system. Building Bastrop County describes that shift as the buffer that keeps residential rates from having to climb, and that can move them down. This site does not promise a dollar figure off a specific homestead. It describes the structure: more of the levy comes from the campus, less of the need comes from it.

What is actually inside the building?

Rows of servers, networking gear, and the power and cooling that keep them running. An AI campus packs that building with high-performance chips used to train and run models. The standard the industry builds to is five nines: available 99.999% of the time. Every map search, bank transfer, prescription refill, and storm alert already passes through a building like this somewhere. The local question is whether Bastrop’s tax roll includes one.

Data Center Coalition · FAQ

The industry’s answers, kept national.

These are the association’s own replies. They describe the industry and, where noted, Virginia. They are not a headcount or a water meter for Cedar Creek.

Jobs beyond the server hall

Direct jobs at one building, the FAQ says, run from dozens to hundreds, depending on whether the hall is hyperscale, shared, or a smaller edge site. A PwC finding it cites says each of those jobs supports 4.5 jobs elsewhere. Construction of a single hall can take years and employ hundreds of people, sometimes more than a thousand at the peak, and a campus can keep those crews on site for a decade. After opening, the trades stay: electricians, pipefitters, and heating and cooling. The Northern Virginia electricians’ local, as the FAQ quotes it, has more than 30 workers in every finished data center building doing maintenance. In a shared building, tenant staff with badges are on site too, and they often never show up in the owner’s headcount. The FAQ also says these are high-wage jobs that often do not require a four-year degree, and that labor income from the industry grew 11% from 2023 to 2024, faster than the job count itself.

Why the equipment tax break exists

The FAQ’s account is that a data center spends heavily up front and then replaces servers on a cycle of about 3 to 5 years, so a sales-tax exemption on that equipment is what states use to compete. More than 35 states offer one. Manufacturing equipment is exempt in 41 states, and the coalition says the data center version follows that pattern. Analyses it cites for Virginia and Georgia concluded that 90% of the investment in those states would not have been built without the exemption, which would also have meant forgoing the property tax, payroll tax, and other taxes that still get paid. That 90% is those two states’ analyses, as the coalition presents them. It is not a forecast for Bastrop County.

Backup generators

The FAQ says diesel generators are there so the building stays up when the utility goes down, including for hospitals, first responders, and government. It describes them as highly regulated and typically run for a maximum of 30 minutes in an average month, for maintenance and for actual outages. It also says there is no replacement yet that works at the same scale, and that many operators are testing renewable diesel where they can get it.

Data Center Coalition · FAQ

Already in use

The county already lives on buildings like these

None of it announces itself. It looks like a phone, a card, a forecast. Tomorrow Begins Here makes the local point: the only question is whether Bastrop County helps build that infrastructure, or watches the tax base land in some other county.

A morning in the county

  • Weather radar before a storm
  • A school portal and a payroll deposit
  • Maps on the way to work
  • A telehealth visit or a prescription refill

Money and work

  • A card tap at the counter
  • Fraud checks on that tap
  • Cloud files and a video call
  • A permit, a tax filing, a license renewal

Home and safety

  • 911 call routing
  • Emergency phone alerts
  • A doorbell, a thermostat, a photo backup
  • The group text that actually arrives